6 mt Road Blocker Alt Yapı Çalışması ÇİZEN (DRAWN)

advertisement
400
6000
MAX 5000 mm
250
SPİRAL BORU
(SPIRAL PIPES)
HİDROLİK HORTUM
(HYDRAULIC HOSES
1100
UNIT
TRIFAZE
380V
3 Kw
250
6500
250
250
KANAL KAZI ÖLÇÜLERİ
(CANAL EXCAVATION DIMENSIONS)
400mm * 400mm
6500
STOP
990
MAX 5000 mm
250
UNIT
TRIFAZE
380V
3 Kw
700
6000
C30
CONCRETE
HİDROLİK HORTUM
(HYDRAULIC HOSES)
SPİRAL BORU
(SPIRAL PIPES)
PROJE (PROJECT): 6 mt Road Blocker Alt Yapı ADRES (ADRESS): ORGANİZE SANAYİ BÖLGESİ ESKOOP SANAYİ
SİTESİ D1 BLOK NO:2 İKİTELLİ-İSTANBUL
Çalışması
ÇİZEN (DRAWN): MUHAMMED YUSUF KITAY
TARİH (DATE):
KONTROL (CHECKED): KAMBER ÇEVEN
MAKİNA MÜHENDİSİ (MECHANICAL ENGINEER)
[email protected]
TEL: 0212 222 75 00
ÖLÇÜLER "mm" dir.
(DIMENSIONS "mm" )
Download